Skip to content. facebook linkedin twitter youtube. ABOUT; PRODUCTS; BRANDS; INDUSTRIES & SERVICES; NEWS; LIBRARY
Nov 06, 2002 · The research evaluated several newly developed low temperature performance tests under Nevada’s conditions. The goal of the research was to determine the applicability of the tests for characterizing the low-temperature response of Nevada’s asphalt binders and hot-mixed asphalt (HMA) mixtures. Construction-related HMA temperature differen-tials resulted in the placement of a significantly cooler portion of HMA mass into the mat. The cooler mass came from the surface layer or crust that typi-cally develops during the transport of HMA from the mixing plant to the job site. Originally it was thought HMA specifications (Items 341, 342, 344, 346, 347, and 348) offer contractor incentives to use this imaging technique by eliminating the contractor’s requirement to run density profiles (not applicable for Items 347, 348), and by relaxing the placement temperature requirements. than the minimum laydown temperature for AC nor higher than 350º F (175º C) or the manufacturer’s recommendations for polymer modified asphalt (i.e., PG 76-22 and PG 70-28). Additionally, not more than one of the four additional temperature readingsmay be outside of specification limits for the load to be accepted for use on the project. Enter a temperature that you would like and choose your units: What the temperature feels like to your body: Fahrenheit Celsius ° F: Enter your relative humidity: HOT MIX ASPHALT (HMA) MIX DESIGN LABORATORY QUALIFICATIONS 2 (Revised: 01/21/2020) A copy of the AMRL inspection report and any responses to deficiencies are to be sent to: Michigan Department of Transportation Construction Field Services Bituminous Mix Design Unit P.O. Box 30050 Lansing, Michigan 48909 3. Crack Sealing. Crack sealing is used for active cracks in asphalt pavements so that water is kept out of the pavements. Sealant installation is affected by a number of factors including: humidity, rout size, crack preparation method, heating time, sealant finishing and protection, and the temperature of air, sealant and pavement.
Nov 09, 2016 · The issue of placing hot mix asphalt (HMA) in cold weather comes up every fall, winter and springs. Projects get delayed and damp. Specifications generally set weather and temperature limits beyond which paving is to be stopped. But jobs often need to be completed in spite of the specification limits.
Mixture and the typical HMA pay item is the Performance Graded binder. For High Stress Mixtures, increase the high temperature binder by one grade and add the polymer. The increase in the high temperature number results in an asphalt binder with improved high temperature stiffness or rutting resistance for both the leveling and top course. Jan 16, 2017 · When placing HMA, ensure that the mix temperature is a minimum of 290° F at the mid-depth of the mat behind the screed when the compaction process begins. Related Why Tracking Temperatures is Key
Hot-mix asphalt (HMA) Excel help. Shades. Shades version 11.17; Shades aggregate database; Hamburg version 2.01 HMA plant programs. HMA plant 09 instructions; HMA plant report v12.12; HMA plant report example 8.01; HMA chart 12.04; Plant calibration worksheet; HMA plant checklist; Asphalt monitor checklist; HMA daily field report v1.09 Blank
Intelligent Compaction rollers are used in compaction of hot mix asphalt for breakdown and intermediate compaction for method compaction process and for density required HMA. The current nssp 39-8 requires use of steel drum vibratory roller equipped with GPS, temperature sensor, accelerometer data acquisition system and displays.